Portfolio / 2026

Assets in
motion.

One operating solar site and seven projects in development represent 7.5 MW of planned nominal capacity, with a growth target of 12–15 MW.

08
sites
STATUS / AUG 2026
02 In development
Sites 014 · 015 · 024Cluster A

The cluster

Adjacent sites moving together through design, licensing and construction planning.

View on map ↗
03 In development
Site 0421 MW + storage

Stored daylight

A planned solar site designed with storage capacity for a more flexible grid connection.

View on map ↗
04 In development
Sites 303 · 142Pipeline

Next horizon

Further sites preparing for permits, acquisition and the next phase of growth.

View on map ↗
05 Leased site
Parcel 148 · Akoursos1 MW plan

Akoursos 148

A leased site with a documented photovoltaic park layout prepared for the next development phase.

View on map ↗

From ground to grid.

A clear path.
Visible progress.

Every project follows the same controlled sequence. Together, these six stages show how a site moves from secured land to long-term operation.

01FOUNDATION

Land secured

Site potential, access and ownership context are confirmed.

02ENGINEERING

Design

Panels, inverters, storage and the grid pathway are coordinated.

03APPROVALS

Permitting

Licensing, planning and connection requirements move forward.

04DELIVERY

Construction

Civil works, equipment installation and testing bring the site to life.

05ENERGISATION

Grid connection

The completed system is tested and connected to the electricity network.

06LONG TERM

Operation

Monitoring and active management keep performance visible over time.

See the portfolio in context.

One island.
Many signals.

A satellite-first view of the full portfolio. Select a site to zoom in, inspect its boundary and open a quick project summary.

08 SITES / PORTFOLIO VIEWSATELLITE / PROJECT BOUNDARIES
Operational In development Leased / pipelineRequest the full project deck ↗