First light
Our first operating solar asset in the Nata area — the live pulse at the centre of the portfolio.
View on map ↗
Start a conversation↗
One operating solar site and seven projects in development represent 7.5 MW of planned nominal capacity, with a growth target of 12–15 MW.
Our first operating solar asset in the Nata area — the live pulse at the centre of the portfolio.
View on map ↗Adjacent sites moving together through design, licensing and construction planning.
View on map ↗A planned solar site designed with storage capacity for a more flexible grid connection.
View on map ↗Further sites preparing for permits, acquisition and the next phase of growth.
View on map ↗A leased site with a documented photovoltaic park layout prepared for the next development phase.
View on map ↗From ground to grid.
Every project follows the same controlled sequence. Together, these six stages show how a site moves from secured land to long-term operation.
Site potential, access and ownership context are confirmed.
Panels, inverters, storage and the grid pathway are coordinated.
Licensing, planning and connection requirements move forward.
Civil works, equipment installation and testing bring the site to life.
The completed system is tested and connected to the electricity network.
Monitoring and active management keep performance visible over time.
See the portfolio in context.
A satellite-first view of the full portfolio. Select a site to zoom in, inspect its boundary and open a quick project summary.